Cetec - Project History - July 2002 - Present
Projects worked on include:
- Repos Project - part of a team working on a record-breaking project to
re-platform the REPOS infrastructure of a top three Retail chain. Our
role involved Server Rack installation, Server setup, configuration and
installation.Installing and configuring standalone and network
printers.Configuring Cisco switches and dealing with interoperability
of Windows 2000 server and workstation with Unix servers.Managed teams
of engineers rolling out Windows 2000 workstations to the desktop.
- Server PSU Swap-out Project - replacing recalled power supply units in Compaq servers.
- PC installation project
- installed and
configured several PCs and printers in Individuals homes as part of a
London borough project to provide PCs for carers and care leavers.
Configure PCs for Internet access and provided bespoke training as
required.
- Schools IT Audit -
carry out IT infrastructure audit covering details of Servers,
workstations, networks and peripherals in schools all over the country.
Associates involved: 1
-----------------------------------------------------------------------------------------------------------------
Aspire National Training Centre
- Project History - September 2002 -
Present
Projects worked on include:
- Mail Migration -
migrations of MS Mail to Windows Exchange 2000 and bringing the
Internet Mail hosting in-house.
- Desktop Upgrade - upgrading all Windows 98 desktop to Windows 2000
workstation.
- Sportsoft Upgrade - upgrading a critical application from a desktop to a
full-fledged server running Windows 2000.
- Anti-virus Migration
- migrating anti-virus software from Command Antivirus to Sophos
Enterprise with additional mail scanning capability.
Ongoing projects include:
- Main Server Upgrade
- upgrading the main file server to a higher specification server.
- Disaster Recovery - drawing up and testing a Disaster recovery plan.
- Raiser's Edge Upgrade
- upgrading another key application from a workstation to a
full-fledged server running Windows 2000.
Associates involved: 2
--------------------------------------------------------------------------------------------------------------------------------------------
Peace Alliance - Project History - July 2002 - Present
Projects worked on include:
- Network Design -
design and installation of a Windows 2000 network with 8 desktops.
- Email Set-up -
setup of an email infrastructure based on Exchange 2000.
- Internet Access Set-up
- setup and configuration of Broadband Internet connection and bringing
Internet mail in-house.
- Cabling Installation
- installation of additional 12 Cat5 UTP outlets Backup Set-up - setup
- Anti-virus Set-up
- setup Antivirus infrastructure
Associates involved: 3
----------------------------------------------------------------------------------------------------------------
Vinbrooks Real Estate
- Project History - October 2001 -
Present
Projects worked on include:
- IT Review -
comprehensive review of the IT infrastructure. Proposed and implemented
several recommendations to improve security, disaster recovery, and
automation of the business process. Resolved existing hardware and
software issues and provided bespoke training.
- Email Issues -
Troubleshooting and resolution of the company email infrastructure.
Ongoing projects include:
- New Office Installation
- complete responsibility for the design and installation of a network
in the company's new office. Includes the installation of Cat 5 cabling
infrastructure with 12 UTP outlets and setting up all the PCs and
peripherals as part of a network. Connecting the network to the
Internet.
Associates involved: 2
----------------------------------------------------------------------------------------------------------------
EuroHygiene
- Project History - Dec 2002 - July
2003
Projects worked on include:
- Server Installation -
installed and configured Windows 2003 server and printers. Implemented
requested group policy and configured shared access to the Internet.
Associates involved: 2
----------------------------------------------------------------------------------------------------------------
Lloyds Register Of
Shipping - Project History - March -
August 2001
Projects worked on include:
- Server Decommissioning
- as Part of a network consolidation project, planned and executed the
retirement of several NT and Netware servers and streamlined several
others. Migrated users from bindery servers to the NDS infrastructure.
- Netware Upgrade -
Planned and executed a project to upgrade the Mac to Netware 3
infrastructure to a Netware 4 environment. This made way for retiring
old systems and reducing administrative overheads associated with
maintaining outdated systems.
- Server Installation
- built several Netware 4 servers as part of a project to upgrade to NT
2000.
- Network Documentation
- undertook documentation of Network infrastructure and administrative
policies as part of a knowledge transfer project.
Associates involved: 1
--------------------------------------------------------------------------------------------------------------------------------------------
Others
We have also done work for several
clients running home based businesses and several individuals, carrying
out work ranging from PC installation, maintenance and troubleshooting,
setting up home networks and configuring access to the Internet.
|